§ 165-82. Topsoil redistribution.  


Latest version.
  • Topsoil available at the site and moved during the course of construction shall be redistributed to all areas uncovered in the course of construction. Whenever sufficient topsoil is not available at the site, additional topsoil shall be obtained and distributed in such a manner as to provide a cover of at least six inches of topsoil or other approved cover to prevent soil erosion on the areas uncovered during the course of construction or excavation. No topsoil shall be removed from the site of the development or used as spoil.