§ 110-3. Fees.  


Latest version.
  • A. 
    The fee for a construction permit shall be the sum of the subcode fees listed herein and shall be paid before the permit is issued.
    B. 
    The Construction Official shall, with the advice of the subcode officials, prepare and submit to the Mayor and Council biannually a report recommending a fee schedule based on the operational expenses of the agency and any other expenses of the municipality fairly attributable to the enforcement of the State Uniform Construction Code Act.
    (1) 
    Building subcode fees shall be as follows.
    (a) 
    All use groups. For all new construction, including additions: $0.15 per cubic foot of building or structures, provided that the minimum fee be $200 for new construction and $100 for additions.
    (b) 
    Renovations, alterations, repair and minor work fees:
    [1] 
    Estimated cost up to $50,000: $30 per $1,000.
    [2] 
    Portion of cost over $50,001: $20 per $1,000.
    [3] 
    For combination of work involving new structures and existing structure work, the sum of the fees are computed separately as renovations/alterations/repairs and volume fees.
    [4] 
    (Reserved)
    [5] 
    Taking tank out of service, altering the piping or otherwise modifying any installation: $15 per $1,000 of estimated cost of removal.
    [6] 
    Minimum fee for R/3 and R/5 use groups shall be $80. Minimum fee for all other uses and commercial $100.
    (c) 
    Sign permits. The fee for a permit to construct a sign shall be $2 per square foot of sign, provided the minimum fee shall be $60. In case of a double-faced sign, the fee will be based on one side of face.
    (d) 
    Plan review fee. The fee for plan review shall be 20% of the amount to be charged for all permits not considered minor work and shall be paid before the plans are reviewed. The amount paid for this fee shall be credited toward the amount of the fee to be charged for the construction permit.
    (2) 
    Plumbing subcode fees shall be as follows:
    (a) 
    Installation, alteration and replacement of a fixture, stack or water heater: $25 per fixture or condensate line, provided that the minimum fee is $80. Fixtures are to include all fixtures, pieces of equipment or appliances connected to the plumbing system and for each appliance connected to the gas piping or oil piping system, except as indicated below.
    (b) 
    Total number of special devices: $65 per device. Special devices include grease traps, oil separators, refrigeration units, backflow preventers, steam boilers, hot water boilers, active solar systems, sewer pumps and interceptors, air conditioning units, HVAC, and furnaces.
    (c) 
    Sewer services, water services, trench: $75 per.
    (d) 
    Chimney liner or metal fire vent: $100 per.
    (e) 
    Minimum fee shall be $80.
    (3) 
    Electrical subcode fees shall be as follows:
    (a) 
    Electrical fixtures and devices. First 50: fee is $50; increments of 25 additional fixtures and devices: fee is $9. Fixtures and devices to be counted for in these items include lighting outlets, wall switches, smoke detectors, fluorescent fixtures, convenience receptacles or similar fixtures and motors or devices of one horsepower (HP) or one kilowatt (KW) or less.
    (b) 
    The following Subsection B(3)(b)[1] through [4]: for calculating the following electrical fees, all motors except those plug-in appliances shall be counted, including control equipment, generators, transformers and all heating, cooking or other devices consuming or generating electrical current.
    [1] 
    Each motor or electrical device greater than one HP and less than or equal to 10 HP and for transformers and generators greater than one KW and less than or equal to 10 KW: fee is $15 each.
    [2] 
    Each motor or electrical device greater than 10 HP and less than or equal to 50 HP, for each service panel, service entrance or subpanel less than or equal to 200 amps, and for all transformers and generators greater than 10 KW and less than or equal to 45 KW, and for each utility load management device: fee is $55.
    [3] 
    Each motor or electrical device greater than 50 HP and less than or equal to 100 HP, for each service panel, service entrance or subpanel greater than or equal to 400 amps, and for all transformers and generators greater than 45 KW and less than or equal to 112.5 KW: fee is $100.
    [4] 
    Each motor or electrical device greater than 100 HP, for each service panel, service entrance or subpanel greater than 1,000 amps, and for each transformer or generator greater than 112.5 KW: fee is $465.
    (c) 
    Electric service: $75 per.
    (d) 
    Electric trench: $75 per.
    (e) 
    Minimum fee shall be $80.
    (4) 
    Asbestos abatement fee shall be $70 plus certificate of occupancy fee of $14.
    (5) 
    Standpipe fee shall be $229 each.
    (6) 
    Fire equipment and hazardous equipment fees.
    (a) 
    Smoke detectors, heat detectors and carbon monoxide detector, one to 10: $35; each additional detector: $2.
    (b) 
    Sprinkler heads:
    Number of Heads
    Fee
    1 to 20
    $80
    21 to 100
    $125
    101 to 200
    $300
    201 to 400
    $650
    Over 400
    $1,000
    (c) 
    Independent pre-engineered systems: fee shall be $90 per system.
    (d) 
    Gas- or oil-fired appliance which is not connected to plumbing system: fee shall be $45 per appliance.
    (e) 
    Kitchen exhaust system: fee shall be $50 per system.
    (f) 
    Incinerators: fee shall be $65 per incinerator.
    (g) 
    Crematoriums: fee shall be $365 per crematorium.
    (h) 
    Installation or replacement of storage tanks $80.
    (i) 
    Storage tank removal $100 per tank.
    (j) 
    Minimum fee shall be $80.
    (7) 
    Demolition or removal permit fees.
    (a) 
    For a structure less than 5,000 square feet in area and less than 30 feet in height, or for one- and two-family residences (R-3, R-4 use), and for structures on farms: fee of $200.
    (b) 
    All other structures: fee of $300.
    (8) 
    Certificates of occupancy fees.
    (a) 
    Certificate of occupancy (residential) for new construction/rehab and addition: $250.
    (b) 
    Certificate of occupancy (nonresidential): 10% of permit fee.
    (c) 
    Certificate of occupancy for change of use group: $200.
    (d) 
    Temporary certificate of occupancy: $50 with an extension of $25.
    (e) 
    Certificate of continued occupancy: $275.
    (f) 
    Certificate of compliance (annual inspections of public pools, spas, and hot tubs): $100.
    (9) 
    Elevator fee: Apply to the current fees of the State of New Jersey, Division of Housing and Development, Uniform Construction Code, Elevator Safety Subcode, Subchapter 12.
    C. 
    Variation fee. Granting a variation for residential: $200; commercial: $250.
    D. 
    Lead hazard abatement.
    (1) 
    The fee for lead abatement shall be $140.
    (2) 
    The fee for lead abatement clearance certificate shall be $28.
    E. 
    Miscellaneous fees.
    (1) 
    For cross connections and backflow preventers, which are subject to testing and require annual inspections, the fee shall be $85.
    (2) 
    Mechanical fee for new installation/replacement equipment (R5 use group only): $85 per unit.
    (3) 
    Asbestos abatement fee with certificate of occupancy: $150.
    (4) 
    Lead hazard abatement fee with clearance certificate: $180.
    (5) 
    Change of contractor fee (plus any additional items or cost): $35.
    (6) 
    Updated plans submittal fee (plus any additional items or cost): $35.
    (7) 
    All suspensions of permits pursuant to N.J.A.C. 5:23-2.16(b) will not be refunded in whole or in part.
    F. 
    State training fees shall be pursuant to current regulations of N.J.A.C. 5:23-4.19.
    G. 
    Engineering fee. For engineering review: $200.
    H. 
    Special off-hours' inspection fees shall be determined by the Construction Official prior to any inspection and based on request.
    I. 
    Surcharge fee shall be pursuant to current regulations of N.J.A.C. 5:23-2.28.
Amended 10-19-2009 by Ord. No. O-17-09; 10-15-2018 by Ord. No. O-18-18